Solar Quotes in Omaha, NE
If OPPD is your utility
- OPPD's Rider Schedule No. 483 Net Metering Service (rate manual effective May 22, 2026) applies to qualified generators up to 100 kW AC. Its net excess generation credit is 4.00 cents/kWh in summer (June 1–Sept. 30) and 3.52 cents/kWh the rest of the year. Source: https://oppd.com/media/172612/oppd-rate-manual.pdf (accessed 2026-10-20)
- If your bill credit exceeds that month's bill, the balance carries to future months, and any excess Net Excess Generation credits left at the end of the calendar year are paid to you. You're still billed non-energy charges. Source: https://oppd.com/media/172612/oppd-rate-manual.pdf (accessed 2026-10-20)
- OPPD provides bidirectional-capable metering at no additional cost, you keep the renewable energy credits, you're responsible for the equipment needed to interconnect, and Rider 483 customers aren't eligible for OPPD's Level Payment Plan. Source: https://oppd.com/media/172612/oppd-rate-manual.pdf (accessed 2026-10-20)
A note on the federal tax credit
The federal residential clean energy credit (25D) doesn't apply to expenditures made after December 31, 2025. The IRS treats an expenditure as made when installation is completed. Source: https://www.irs.gov/newsroom/faqs-for-modification-of-sections-25c-25d-25e-30c-30d-45l-45w-and-179d-under-public-law-119-21-139-stat-72-july-4-2025-commonly-known-as-the-one-big-beautiful-bill-obbb (accessed 2026-10-20). This page isn't tax advice.
Questions to ask
- Which OPPD tariff or rider does your estimate assume, and at what export credit?
- How much of my production does your estimate assume I'll use on site versus export?
- What happens to my credits if I move or close my account?
Get one quote from one installer